The home decoration project budget book should have the following 7 points: 1. Project name.
2. Quantity of projects.
3. Quantity unit.
4. Project unit price and total price.
5. Construction technology.
6. Description of project materials.
7. Calculation method of engineering quantities.
1. Original reconstruction part 1. Demolition of walls of 110㎡. Labor costs, including garbage removal. 2. Labor costs for removal of floor tiles of 18㎡. including garbage removal. 3. New walls of 15㎡. High-quality lightweight bricks, 325 cement for stone wells, including double-sided plastering.
Count 2 Wall treatment 1 Wall repair 1 Labor fee and material fee 2 Wall fan ash 620㎡ Imported kraft paper, Hong Kong vegetable glue, Jiangjun paint interior wall paint (the interior wall paint is constructed using the roller coating process) Three water supply parts m1 water supply
Pipe 80m 1620 Rifeng Pipe Materials Pipe Fittings 2 Drainage Pipe 35m 50 Lesso or Gudi Pipes and Fittings 3 Sewage Pipe 15m 110 Lesso or Gudi Pipes and Fittings 4 Toilet Installation 4 Items The toilet owner purchased by himself, and the construction party includes auxiliary materials and labor.
5 Wash basin installation items 4 are purchased by the owner, and construction includes auxiliary materials and labor.
6. The dishwashing tray installation item 1 is purchased by the owner. The construction includes auxiliary materials and labor.
7 Shower room installation 3 items of labor and auxiliary materials, shower room owner purchased by himself Subtotal 4 Power distribution part 1 Ordinary switch 100-bit Qingfeng 2.5㎜ 2 Double plastic wire, Liansu wire tube, Matsumoto B9 electrical appliance 2 Ordinary socket 120-bit Qingfeng
2.5㎜2 double plastic wires, Lesso line tubes, Matsumoto B6 electrical appliances 3 air conditioner special lines 8 Qingfeng 4.0㎜2 double plastic wires, Lesso line tubes, Matsumoto B6 electrical appliances 4 electric water heater special lines 3 Qingfeng 4.0㎜2 double plastic
Wires, Lesso wire tubes, Matsumoto B6 Electrical 5 telephone lines, 8 Qingfeng telephone lines, Lesso wire tubes, Matsumoto B6 Electrical 6 network lines, 3 eight-core network lines, Matsumoto B6 Electrical 7 TV lines, 5 Xinhong double shields
TV cable, Lesso conduit, Matsumoto B6 Electrical Appliances 8 Distribution Boxes 2 Foundation Electrical Boxes, Merlin Gerin Electrical Appliances 9 Lighting Fixtures Installation 1 Labor Charge, Lamps Purchased by Owners Subtotal 5 Mud Water Part 1 Restaurant Marble Paving 13.75㎡
The labor costs and auxiliary materials are purchased by the marble owners themselves.
2. The labor cost and auxiliary materials for the installation of the footing line are 23m, and the owner of the footing line will purchase them by himself.
3. Labor costs and auxiliary materials for bathroom and kitchen anti-skid tiles of 40 square meters. The anti-skid tiles are purchased by the owner.
(Including balcony) 4 bathrooms and kitchen wall tiles of 110㎡ Labor costs and accessories, the wall tiles are purchased by the owner.
5. The labor cost and auxiliary materials for paving 12m of threshold stone are purchased by the marble owner.
6 Window sill stone paving costs 5m labor and auxiliary materials, and the window sill marble owner will purchase it himself.
7Waterproof treatment: 85㎡ Degao waterproof coating.
8 Marble parquet paving 14.5㎡ labor costs and auxiliary materials, floor tiles purchased by the owner.
9 Restaurant tempered glass decoration 1 item 15㎜ tempered glass, pebbles and labor costs 10 Floor leveling 0㎡ 325 stone well cement, medium sand.
11 Wash basin production and installation 5 frame production, excluding marble.
Subtotal six wood production part A Living room and dining room 1 Kitchen door and door frame 1 item 18mm large core board, 9mm plywood, Guanhua decorative panel, 10mm solid wood door edge and door frame line, excluding door lock 2 Entrance right decoration
The cabinet is 9.54 square meters with 18mm large core board, 9mm and 5mm plywood, Guanhua decorative panel, and solid wood line closing.
3 Restaurant silver mirror decoration 2㎡ 9cm plywood, solid wood line stickers, Shekou silver mirror.
4. The dining room low cabinet is made of 1.2m 18mm large core board, 9mm and 5mm plywood, Guanhua decorative panel, and solid wood line closing.
5 Restaurant wall decoration 6.75m 18mm large core board, 9mm plywood, Guanhua decorative panel, solid wood line closing, 6mm lacquered glass and sand steel strip 6 Sofa background decoration cabinet 3.84m2 18mm large core board, 9mm plywood, crown
Chinese veneer panel, solid wood door edge and door frame, door lock not included. 7 sofa background marble decoration 1.84㎡ jazz white marble, wooden waistline decoration.
(The marble owner purchased it by himself) 8 sago marbles are used to decorate 1.96 square meters of sago marble and 2.5 squid lines.
(Marble owner purchased by himself) 9 living room decorative cabinets 12.37㎡ 18cm large core board, 9cm, 5cm plywood, shadow wood veneer, 5cm, 10cm clear glass, aluminum alloy frame 10 TV background 6.77㎡ tree root veneer,
1.2mm stainless steel sand steel bar 11 TV cabinet 2.7m18mm large core board, stainless steel decoration, fireproof board inside, no marble.
Stainless steel ball track.
12 TV background side marble decoration 4.76㎡ chicken mouth line decoration, labor cost, marble not included.
13. The ceiling of the living room and dining room is 54.95㎡3*4 wooden square, 9mm, 5mm plywood.
Subtotal B Master room 1 door and door frame 1 item 18mm large core board, 9mm plywood, Guanhua decorative panel, 10mm solid wood door edge and door frame line, 5mm craft glass, door lock not included 2 wardrobes 5.42㎡18
Large core board, 9mm and 5mm plywood, Guanhua veneer, solid wood thread closing, fireproof board inside, semi-circular line decoration 3 bedside background 4.7㎡ 9mm bottom board, imported waterproof cloth, high-density sponge 4 bedside tables 2
Items include 18mm large core board, 9mm and 5mm plywood, Guanhua veneer panel, internal fireproof board, and solid wood thread closing.
5 Stainless steel railings 3.32㎡1.0mm stainless steel, 10mm tempered glass.