The three most important words in the dictionary are will, work and waiting. I will build my pyramid of success on these three cornerstones. The following are five selected summaries of material management in 219 that I brought to you for your reference.
five articles selected from the summary of material management in 219-
since I went to the third place to do material management in 1993, with the strong support and strict requirements of the director, I have been strictly responsible for material management. So that the materials, tools, machines and tools in our place have not been unreasonably used, lost or damaged over the years.
in 1998, our bureau began to implement the ISO-9 standard, which brought a set of scientific and standardized management modes for material management, and made the management work well documented. As a material engineer, I require myself to conscientiously perform the duties stipulated in this post, conscientiously implement the various rules and regulations of material management, and use and keep all materials, tools, machines and other property in the department as the property of my family.
in the management of engineering materials, the receiving and delivery of materials should be strictly controlled. Earnestly do a good job in incoming inspection of various materials, and check whether the materials are consistent with the names, specifications, models and quantities on the issue list, and whether the appearance is intact. If any material that does not meet the standard requirements is found, it shall be reported to the person in charge and the Equipment Department in time, and the goods shall be exchanged or returned. Then fill in the material income verification list according to the actual income, and put the materials in the temporary warehouse on the construction site with reasonable, safe, tidy and classification code, and make a good mark. In each material distribution, the materials are collected and distributed in strict accordance with the materials filled in by the competent technician. The surplus materials of the project shall be treated according to the specified requirements. After the project is completed, the "List of Engineering Materials Consumption" shall be filled out according to the actual income, consumption and balance of materials, and the surplus materials of the project shall be handed over to Party A for signature and acceptance by the responsible person of Party A.. Materials, tools and machines that need to be purchased by themselves during construction shall be purchased after being approved by the Equipment Department.
The use and management of all kinds of materials, machines and tools in the construction process should be handled by special personnel, especially generators and pumps. It is necessary to explain to the operators how to use, manage and maintain them reasonably and safely. If unreasonable use is found, it should be reported to the Director for criticism, education or punishment. Every time after the completion of the project, all tools and machines should be thoroughly inspected, maintained and maintained to prepare for the next project. According to the actual use of materials in the project, the accounts are recorded and cancelled, so that the accounts are attached.
Through the management of materials, machines and tools over the years, I think that as a material manager, I should do four steps:
The first step is to manage materials by categories and items. First of all, the long-term materials are classified and managed, and the commonly used materials are put together, and each material is marked according to its name, specification and quantity, so as to be clear at a glance.
step 2, manage the tools by item. Store precious tools and general tools in different toolboxes, protect precious tools individually, and indicate the name of memory tools outside the box; Long-line tools and open-line tools should be stacked separately, and large tools should be placed in obvious places. Each tool should be effectively marked according to its name, specification and quantity, so that everyone can see and find it, and the good and bad should be separated.
the third step is to focus on management of construction machines and tools. First of all, put the generator and pump in a place where they are easy to lift and put, and mark their names, specifications and quality. Engineers of each generator and pump should carry out regular maintenance after use to ensure the use of the project. In the construction, it is necessary to assign special personnel to use, regularly maintain and replace the oil. Deal with the problems immediately after they are found to ensure the safe use of the project. Instruments and joint tools are also required to be used and kept by special personnel.
step 4, the material management ledger is registered by materials, tools and machines. Indicate their names, specifications, quantity, production date and quality. After each project is completed, the accounts shall be recorded and cancelled according to the actual quantity, so as to ensure that the accounts and materials are consistent, and they shall be checked and carried forward at the end of each year, and any discrepancy found shall be corrected in time.
The warehouse management should be cleaned, inspected, safe and fire-proof, and the hidden dangers should be reported to the leaders in time and handled in time.
based on my practical work experience, I have concluded that to do a good job in material management, we should do "four diligence": diligent management, diligent inspection, diligent maintenance and diligent checking of accounts.
five selected articles on material management in 219
under the strong support and correct leadership of the company's leaders, with the emphasis on strengthening management and closely focusing on business, and in line with the service tenet of "honesty, diligence, pioneering and innovation" and the requirements of "higher efficiency, better quality and better service", we strive to improve the potential of material supply, and all the work has been steadily improved.
first, do a good job in material warehousing acceptance, and pay special attention to quantity and quality control.
Material warehousing acceptance is the beginning of warehousing management. There are many kinds of materials required for steel structures, and the sources of materials are different. Therefore, after the materials arrive at the warehouse, they must be strictly accepted by the storekeeper before warehousing. Three acceptance tasks should be done when warehousing: inspection of varieties, inspection of specifications and inspection of quantity. And require the custodian to establish a high sense of responsibility, carefully check and carefully check. Acceptance should be timely and accurate and completed within the prescribed time limit. At the same time, the supporting materials should be comprehensively inspected to lay a good foundation for storage and maintenance.
receiving and delivering materials in the fourth quarter: 2,261 tons of medium plate, 243 tons of profile, 96 tons of H-beam, 4, sets of ordinary bolts, 2, sets of ordinary nuts and 1,214 sets of high-strength bolts; Paint 19. 8 tons, 4 tons of thinners; Flux 11. 6 tons, welding wire 31. 9 tons kg, welding electrode 4. Five tons.
2. Strictly go through the procedures of raw materials and equipment leaving the warehouse, and improve the distribution system.
the delivery of materials is the need to ensure production and engineering, and it is also the source for enterprises to control costs and obtain profits. Its basic requirements are: fast and timely quality and quantity, strict inspection of receiving procedures, prevention of unreasonable receiving, and strict compliance with rules and regulations. The principle of "first-in, first-out" should be seriously implemented according to the time when materials enter the warehouse. Adhere to the principles of "three inspections", "three checks" and "five non-delivery" when delivering goods.
third, set up an account and set up a card, so that the account, card and content are consistent.
it is the basis of strengthening warehouse management to establish and improve warehouse storage cards and material cards, and timely and correctly reflect the quantity dynamics of warehouse materials. 1. Setting of account books and material cards: according to the requirements of the management department, set up account management for warehouse materials according to categories. The use of the material card, in line with the requirements of economy and beauty, can be arranged according to the specific conditions of the warehouse. 2. Operation of account card: After the materials are accepted, the name, specifications, accepted quantity and amount, storage place and No.4 positioning number of the materials shall be itemized in the subsidiary ledger of materials according to the acceptance list. At the same time of acceptance, it is an important work of warehouse management to fill in the material card and hang it on the cargo space, and use the account card correctly to ensure that the account card matches. The quantity of incoming materials, outgoing materials and stocks in 27 was comprehensively checked and counted.
five selected articles on material management in 219
in recent years, our section has conscientiously implemented the relevant regulations of the superior on centralized material procurement, making the whole process of material procurement open, fair and just, and achieved good results. Last year, the company issued to our section the amount of self-purchase, which was 1.1 million yuan. Through measures such as "making procurement public", "carrying out law enforcement supervision on material purchase and standardizing material purchase behavior", our section effectively reduced the amount of self-purchase, and the actual amount of self-purchase in the whole year was 1.23 million yuan, saving more than 62, yuan, and no bad information occurred in material purchase. Our specific practices and experiences are as follows:
1. Establish rules and regulations, clarify responsibilities and standardize material procurement procedures.
relying on the system and standardizing the procurement behavior is the hardware guarantee for building a clean government in the field of material procurement. Since last year, according to the spirit of centralized procurement and centralized management of materials by bureaus and sub-bureaus, we have formulated some regulations on material management in our section, and included "regulations on strengthening the construction of party style and clean government in the process of material procurement" in the "compilation of series systems on party style and clean government construction", which has brought institutional guarantee for standardizing procurement behavior. In terms of material procurement procedures, it is stipulated that except for the materials under centralized management and centralized procurement by the sub-bureau, all production emergency materials, sporadic materials, small machinery and equipment, holiday welfare materials, condolences, etc. authorized by the sub-bureau shall be organized by the bidding team to conduct bidding and procurement, and the materials supply center shall handle them centrally according to the bidding results, and make publicity on a monthly basis; At the same time, it is stipulated that the purchase amount shall not exceed the entrusted amount issued by the branch. For purchasing holiday welfare materials, in addition to earnestly fulfilling the bidding procedures, a "holiday material quality and price evaluation system" has been specially established. It is stipulated that when purchasing holiday materials, the evaluation team composed of Duan Ban, trade union, material supply center, finance, collection and supervision must sign the "Quality and Price Evaluation Form of Holiday Materials", and then submit it to the competent leader for approval and procurement, and publicize the supply channel, variety, price and quantity.
in order to plug the management loopholes, paragraph also stipulates that no workshop or department has the right to purchase office supplies and holiday materials without authorization, and requires all workshops and departments to consciously abide by the discipline of material management and the relevant provisions on material procurement, and all workshops and departments that violate the discipline of material management will be dealt with strictly according to the relevant provisions on building a clean and honest government. Because the procurement procedures and responsibilities are clearly defined and the system is bound, it is easy for the relevant departments to explain clearly how to deal with merchants from all walks of life who sell products for various reasons. Those merchants who meet the bidding qualifications are also willing to participate in fair competition in the form of bidding.
second, implement the publicity of segment affairs, strengthen law enforcement and supervision, and constantly standardize procurement behavior.
while implementing the procurement procedures of materials by tender, our section also insists on doing a good job of "centralized management of materials and law enforcement supervision of centralized procurement" twice a year, with the discipline inspection commission (supervision) taking the lead and comparing with the spirit of superiors, seriously carrying out self-inspection, transferring pressure, strengthening supervision and standardizing behavior. This move not only effectively controlled the procurement cost, promoted the warehouse management, but also effectively strengthened the construction of a clean and honest party style in the field of material procurement, and achieved the goal of rooting out the root causes.
As material procurement is a hot issue concerned by the workers and staff, the criterion for testing the success or failure of "handling this hot issue" should be whether the workers and staff are satisfied with the results of this work or not. To this end, first, we should be fair and just from the source, insist on comparing the quality and price by the bidding team, and determine the procurement channel strictly according to the bidding results; The second is to improve the restriction link and establish the countersignature system of the material procurement price evaluation team; The third is to insist on the monthly disclosure of material procurement status. The material supply center will summarize the material procurement status every month according to the time, unit price, quantity, specification and feeding channel list, and make a detailed list of material procurement, which will be signed and confirmed by the buyer, material officer, material supply director, financial auditor and supervision section chief, and then reported to the competent section chief for signature. The special topic will be publicized to the cadres and workers of the whole section in the section affairs public column, and the report phone number of the section discipline inspection commission will be published in the publicity column to actively understand the supervision of the masses.
2XX is a crucial year for the company's development and construction, and it is very important for the company to lay a solid foundation, become bigger and stronger, and develop healthily and sustainably. Therefore, in 2XX, the General Department will, in accordance with the overall requirements of the company, do a good job in the daily work and focus on the following tasks:
First, strengthen internal management and continue to improve various management systems. Continue to revise and improve the company's internal vehicle management interim measures and the company's office code of conduct, and issue them for implementation. Strictly implement the management processes of the General Department, strengthen the scientific and standardized management of various items of the company, increase the control over the use of office expenses, standardize working procedures, and promote the smooth development of all work.
the second is to strengthen political and professional study and strive to improve service quality. Further strengthen the study of business skills and political thoughts of department personnel, continuously improve the comprehensive level of words, strengthen the understanding and mastery of the intentions of the company's leading bodies, continuously refine, enrich and systematically summarize, better carry the leadership's management ideas, and make the company's management concepts and management ideas more clear. At the same time, do a good job in daily affairs, further improve service attitude and continuously improve service quality.
Third, do a good job in comprehensive assistance and coordination, handle the relationship with leaders and colleagues, and ensure the smooth implementation of the company's government decrees. Strengthen communication and coordination with the departments directly under the higher authorities and local governments, keep abreast of the work trends and requirements of the higher authorities, and actively strive for the support of the higher authorities; Strengthen communication and coordination between the company and various departments and offices, gradually standardize the meeting system, and implement the supervision and supervision system; Strengthen the coordination between departments and offices, form a joint force, create a United and upward working atmosphere, and give full play to the functions of departments.
the fourth is to be a good staff assistant and serve the company's leadership decision-making. Further enhance the awareness of work planning, improve the planning ability, actively think, boldly make suggestions and take the initiative to make suggestions on important issues related to the development and stability of the company, do a good job in supervision and implementation, and play a good role as a staff assistant.
Fifth, cooperate with the Party and the masses, discipline inspection and supervision departments to do a good job in party discipline inspection, complete the relevant work indicators issued by the Group, and ensure the realization of the company's annual work objectives.
Sixth, assist the Chairman in all the work of the board of directors, strengthen tracking, coordination, urging and feedback on the key tasks assigned by the company, and ensure that the key tasks of the company are assigned, inspected, implemented and fed back. At the same time, seriously complete other tasks assigned by the leaders.
time flies, and in a blink of an eye, we have ushered in a new year. Looking back, I have been in our company for * * months, and I have a lot of feelings during my work during these times. As a new employee, I am very grateful to the company for providing me with a platform for growth, so that I can keep learning and making progress in my work and gradually improve my quality and talents. Looking back on the past six months, the company accompanied me through a very important stage of my life, which made me know a lot. Here, I would like to express my heartfelt thanks to the company's leaders, master XX and colleagues. With your help, I can be handy in my work, and with your help, I can take the company's development to a higher level.
after a month's internship in on-site riveting inspection, I took up the post of raw material inspection. My main responsibility is to be responsible for the inspection of incoming and outgoing materials, including the wrong inspection and missing inspection of incoming and outgoing materials; Do a good job in the confirmation of material marking and be responsible for the correctness of marking transplantation; Be responsible for the accuracy of materials and blanking geometric dimensions of main pressure components; Responsible for the batch scrapping caused by the quality problems of the first inspection; For the materials to be reinspected, it is responsible for drawing out the sampling parts according to the regulations, filling in the entrustment form, distributing them to the physical and chemical and metallographic laboratories together with the samples, and retrieving the test report in time.
1. study hard and improve your own quality in an all-round way
As a new employee who has just started to work, my lack of knowledge and experience is my fatal shortcoming, and inspector work is also a special post, which requires endless updating of knowledge and improvement of skills. In order to achieve this requirement, I attach great importance to learning and practice this goal with practical actions.