Flow chart of ashes decoration
Initial stage of construction
What I have to do: apply for a decoration permit.
Print a decoration notice and post it at the door of the unit (notify the neighbors)
notification
Dear neighbor:
Hello, everyone, I am the owner of Room xXX of Unit XX, and I will start the renovation in X month of XX.
I will operate in accordance with relevant regulations and community regulations. Please forgive the inconvenience caused to you during the renovation, and thank you again for your understanding and support.
Required information: ID card, house purchase contract and related information.
note:
It is suggested to install a list of activities in the decoration permit, and the decoration company can provide relevant information.
Hard loading stage
I. Demolition and transformation of the main body (7-8 days)
What should a decoration company do:
Shovel wall skin
sabotage
Build a wall
Glaze the balcony
Remove rubbish
Install central air conditioning
install underfloor heating
What I want to do is:
1. Contact the vehicle to clean up the construction waste.
Step 2 buy toilets and bathrooms
Buy central air conditioning
4. Confirm the floor heating laying mode
note:
Do a good job in floor drain protection to prevent construction waste sewer blockage.
If you want to install (water purifier, water dispenser, garbage disposal, etc. ), make an appointment together; If there is floor heating, the fresh air shall coordinate with the construction party.
If it is necessary to equip the whole house with intelligent equipment, it will only be constructed in the demolition stage.
Second, hydropower transformation stage (about 10 day)
What should the decoration company do: water and electricity disclosure
Circuit laying
Waterway laying
Reconstruction of wall drainage and launching
Embedded faucet
drill
Hydropower point inspection
Hydropower accounting
What I want to do: 1. Buy whole house tiles.
2. Door stone and window stone
3. Understand the whole house customization.
4. Let the master air-condition in the study.
Note: you can buy a floor drain online during the hydropower period, which will be cheaper.
The confirmation of hydropower stations requires the presence of the owner, designer and foreman.
After the completion of water and electricity, remember to ask the master for a statistical table of the number and size requirements of switches, sockets, spotlights and downlights, so as to facilitate the online shopping of related materials in the later period.
Third, the bricklayer stage (about 30 days)
What the decoration company should do: the tiles should be present.
The exposure of bricklayers
waterproof treatment
Waterproof acceptance and photographing
Install floor drain
Whole house custom ruler
Install lintel
Ceramic tile protection
What I want to do is:
1. Buy air heaters for fans.
2. Hot water heater
3. Confirm the floor thickness
4. Indoor sliding doors can be measured
note:
Say hello to the neighbors downstairs when waterproof, and maybe go downstairs to see if there is any water leakage.
Whether lintels need to be installed will affect the previous leveling work. The practice of replacing lintels with extremely narrow wooden strips requires that there is no horizontal height difference on the ground.
When tiling the kitchen and bathroom, prepare the flue check valve.
Four, woodworking stage (about 25 days)
What should a decoration company do:
Woodworking base
Special modeling
Embedded lamp
Open position of lamp
Opening size of lamps and lanterns
Measuring gate
Woodworking acceptance
What I want to do: 1. Confirm the shape size and position of the front veneer, stone and partition.
2. Woodworking, namely: wood, tile and oil. ! The principle is that whoever is dirty will go first.
3. Wooden door installation. Meanwhile, prepare the hardware to be installed.
note:
Main keel spacing 1000mm, secondary keel spacing 400mm, lifting point spacing 1000mm, ceiling width more than 700mm, increase the main keel.
The side keel is made of light steel keel, fixed with expansion screws, with a distance of 600 mm There are two rivets for the fixed side keel and the auxiliary keel, and the main keel should be in a straight line.
V. Oil production stage (about 35 days)
What should a decoration company do:
Wall treatment
Determine the wall material
Underground acceptance
Color mixing and painting
Paint completion acceptance
What I want to do is:
1. Choose the ending, furniture and appliances.
2. Customize double scales for the whole house.
3. Tuyere winding
Step 4 buy a switch panel
5. Hardware procurement
Step 6 buy tile sealant
note:
The putty must be scraped 2-3 times, and then scraped again when it is dry.
Leave a small jar and paint it later.
Soft installation stage. 7. Furniture and household appliances enter the site (the time is undetermined)
In principle, enter the site in the order of big pieces first and then small pieces.
When buying furniture and home appliances, you can consider buying necessities first, and then slowly buying other things.
Eight, ventilation, in addition to formaldehyde, high temperature and high humidity to promote formaldehyde release.
Window ventilation to speed up the removal of formaldehyde
Number nine, report for duty