Gypsum line is familiar to most people. It is often used in decoration. Using gypsum line as a decorative material can increase the layering of the space and is low-cost, so it is becoming more and more popular. Popular with decorators, how do you install plaster lines and what are the steps during installation?
Gypsum line pasting and installation method
Gypsum lines should be pasted after the water and electricity installation is completed. Be sure to Construction is carried out before putting putty on the wall. Because the plaster line is mainly pasted and supplemented by other fixings, the requirements for the base layer are relatively high. It is best to paste it directly on the cement wall. If there is putty when pasting, it should be removed and then pasted. , if there is a suspended ceiling, first suspend the ceiling and then paste the gypsum line, and finally do the wall putty treatment to ensure the best adhesion. The construction method is as follows:
1. Eradicate the original putty layer;
2. Use a level to find the horizontal line to ensure that the plaster lines are installed evenly;
3. Check whether the wall is flat. If the error is large, use cement mortar for painting first. Paste, if the error is good, you can paste it directly;
4. Apply glue and other bonding materials;
5. After the pasting is completed, you need to press it, and the time is at least 2 Minutes or more to ensure that the plaster line is firmly pasted;
6. Check whether there are gaps on the bonding surface, and use glue to fill any gaps;
7. If you want it to be firm, this Special nails can be used for reinforcement;
8. Clean after everything is completed, and check whether it is installed in place.
It is best to have one person cooperate when installing the plaster line. When the length of the line exceeds 2 meters, use both hands to hold it flat to see the elastic line. Press with one hand and slowly press forward. It is best to press more at the top. for a while to avoid falling.
Precautions for installing plaster lines
1. Pay attention to the pressing force during installation to avoid deforming the plaster lines. The joints should be smooth, the slimming body should be clean, and the lines should be straight; installation Construction workers are required to move skillfully and neatly.
2. After the defective repair is completed, sandpaper should be used to polish it to ensure that no joints and defects are visible.
In addition to pasting, direct nailing can also be used to install plaster lines. The effect is also good, but no matter what method is used, the putty at the bonding point should be cleaned to ensure firmness.