1. Any work more than 2 meters above the ground belongs to aerial work. All aerial work personnel, regardless of any type of work, operation time, place and time limit, shall implement this system. 2, workers engaged in aerial work, must pass the physical examination. Anyone suffering from hypertension, heart disease, epilepsy and other people who are not suitable for aerial work are not allowed to engage in aerial work. 3. Stop aerial work under any of the following circumstances: thunder, rain, thunder and lightning, strong winds above level 6, wet steel pipes getting wet, and other possible dangerous situations; After the above situation is over, all kinds of operation equipment can only be operated after being checked and confirmed by the company's safety director and relevant technical personnel. 4, aerial work site, should draw a dangerous area, set up a clear sign, it is forbidden to irrelevant personnel to enter. Workers who often work at high altitude should be equipped with tool bags. Small tools used in aerial work should be put into tool bags, not on steel pipes, scaffolding and buildings. 6. Before climbing, carefully check the climbing tools and safety appliances, such as safety helmet, safety belt, ladder, springboard, scaffolding, etc. If not, immediately improve or refuse to climb. 7, all aerial work personnel, are not allowed to wear hard shoes, all use seat belts. Seat belts are usually hung at the bottom. 8. When working high above the ground, the inflammable and explosive articles at the bottom must be moved to a safe place, and measures should be taken to ensure that the cut metal or sparks will not hurt people or cause fire accidents. 10, aerial workers are not allowed to throw objects from high altitude to the ground, nor are they allowed to throw objects from the ground to high altitude. Objects should be transported by ropes, hanging baskets, overhead vehicles or cranes. 1 1. Under special circumstances, if objects must be thrown to the ground from high altitude, the ground must be guarded by someone to ensure that no one is injured or equipment is damaged. 12. Small machines and tools (such as chain block, jack, etc.) used for aerial work should be placed in proper positions and fastened with ropes and lead wires. 13, don't stand at the end of the springboard when standing on it. There must be no more than 2 workers on the same springboard. 14, should try to avoid up and down at the same time. If it is unavoidable, a special protective shed must be set up between the upper and lower floors, or other protective measures must be taken. Tools and objects are not allowed to be stacked on the upper floors. 15. Guardrails and signs should be set up at the entrance of aerial work to prevent slipping. The above is the explanation of the Regulations on the Management of Aerial Work. For more information, please visit Zhong Da for consultation.
For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd